Woke up at 5:30 AM and started working on a stencil with the congregation logo
to paint on the houses. I woke Della up at 6:30 and she showed me a much better
way to go about it so I started over again. She ended up whipping it out in the
end. I took Clifton to the worksite at 8:00. The first house on the list was
the one with the most difficult location. I helped by making a few trips of
roof materials and then left to get Austin from Hector’s house. We came back to
the house and started work on the presentation to the schools. We made a
brochure and a powerpoint. We finished the brochure but I clicked the exit
button, Publisher crashed and corrupted the file. So we redid it all. Then we
went to the market to arrange the meals for the schools and find information
about making copies. We ate lunch and then came back to the house. After some
finishing touches we went back to the worksite and met with Carlos for grammar
corrections and suggestions. We took Clifton with us and went to the house.
After making the corrections we went across the street to the printer shop.
Then we went to the market and confirmed our accommodations for the meals. We
had the small group bible study in Shucutitan at 5:30 and it was very full with
the Signal Mtn. group. Joel taught the lesson with Hector interpreting on Ecclesiastes.
We got home around 7:00 and I picked up the brochures from the printer shop.
| Worksite - First House |
No comments:
Post a Comment